Before
During
After
We hired the work to be done by Steve at Creative Tile Works. It was so nice to not have to do the whole project like usual and he did it all: ripping out, plumbing, framing, tiling, electrical and drywall. It has been a couple of weeks and things aren't quite done. Steve took longer than he thought to finish and he had to do a job out of town for a week. He thought the shower was usable, but that same day this happened:
A leak!
That's in our ceiling in the family room downstairs, under our bathroom. Steve knows exactly what happened and will be back on Monday to fix it and to finish up the drywall work and caulking. In the mean time, the bath has been calling my name, yet it sits empty, waiting.
After
We hired the work to be done by Steve at Creative Tile Works. It was so nice to not have to do the whole project like usual and he did it all: ripping out, plumbing, framing, tiling, electrical and drywall. It has been a couple of weeks and things aren't quite done. Steve took longer than he thought to finish and he had to do a job out of town for a week. He thought the shower was usable, but that same day this happened:
A leak!
That's in our ceiling in the family room downstairs, under our bathroom. Steve knows exactly what happened and will be back on Monday to fix it and to finish up the drywall work and caulking. In the mean time, the bath has been calling my name, yet it sits empty, waiting.
1 comment:
A big tub is my dream too. congratulations1 i hope you get to use it soon!
Post a Comment